QUANTITY OF CEMENT , SAND REQUIRED FOR DIFFERENT SPECIFICATIONS OF CEMENT PLASTER AND CEMENT POINTING FOR 10 SQUARE METRES

S.NO
DESCRIPTION OF WORK
CEMENT
SAND
CUB.M
BAGS
CUB.M
1
2
3.
4
5
6
7
8
9
10
11
12
13
14
15

1.25 cm thick cement plaster (1:6)
2.50 cm thick cement plaster (1:6)
6 mm thick cement plaster (1:5)
1.25 cm thick cement plaster (1:5)
2.50 cm thick cement plaster (1:5)
6 mm thick cement plaster (1:4)
1.25 cm thick cement plaster (1:4)
2.50 cm thick cement plaster (1:4)
6 mm thick cement plaster ( 1:3)
1.25 mm thick cement plaster (1:3)
2.50 cm thick cement plaster (1:3)
Cement pointing flush (1:2)
Cement pointing deep (1:2)
Cement pointing (flush,rule pointing)
Deep or projecting pointing (1:3)

0.021
0.430
0.012
0.025
0.055
0.015
0.300
0.600
0.180
0.038
0.075
0.017
0.027
---
---
0.72
1.27
0.35
0.74
1.47
0.42
0.88
1.76
0.53
1.12
2.20
0.50
0.80
0.31
0.41
0.125
0.258
0.600
0.125
0.250
0.058
0.120
0.240
0.540
0.114
0.225
0.035
0.550
---
---



QUANTITY OF LIME ,COLOUR AND PAINT REQUIRED FOR WHITE WASHING COLOUR WASHING AND PAINTING ONE SQURE METRE AREA


S.NO

DESCRIPTION

UNIT
QUANTITY  OF LIME ( kg)
1
WHITE WASHING

 1.One coat
 2.Two coat
 3.Three coat


Sq.m
Sq.m
Sq.m


0.15
0.25
0.35
2
COLOUR WASHING

 1.One coat
 2.Two coat


Sq.m
Sq.m


0.10
0.20
3
PAINTING

1.Two coats of synthetic enamel paint  on     
   new wood or steel word
   Old wood or steed word
2.two coats of ready mixed paint on          
    new wood or steed work
    Old wood or steel work
3.one coat of synthetic enamel paint on
     Old wood or steel work
4.one coat of ready mixed paint on old
     Wood or steel work



Sq.m
Sq.m

Sq.m
Sq.m

Sq.m

Sq.m

Paint ( litres)


0.145
0.118

0.122
0.098

0.065

0.054

4
SOLINGNUM OR CREOSOTE PAINT

   Two  coat
   One coat


Sq.m
Sq.m


0.069
0.039
5
DISTEMPERING

    Two coat on new work
    One coat on od work
    Two coats on old work


Sq.m
Sq.m
Sq.m


0.171
0.073
0.146
6
CEMENT PAINTS

   1.suitable brick work
   2.in situ concrete
   3.cement sand rendering
   4.wall and fiber boards
   5.rough coat
   6.concrete block



Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m


1.65-2.90
2.90-3.70
2.0-2.90
2.50-4.1
1.0-1.60
1.60-2.70

IS IT USEFUL FOR YOU THEN PLEASE SHARE AND SUBSCRIBE

  If you have any query about that post then ask in comment section below I will reply as early as possible







Share:

Popular Posts